HAZID

A Hazard Identification Study (HAZID) is a structured technique using guidewords aims to identify potential hazards arising from the design, siting and operation of the plant. Where appropriate a HAZID can be conducted during conceptual design but definitely during the detail design phase.

During a HAZID study the proposed design is systematically examined, section by section using the guidewords to generate a free ranging discussion. The HAZID involves using a series of guidewords to determine potential hazards from the plant, and where a cause exists, the consequences of the hazard are examined so that any necessary remedial action can be taken

Prior to the HAZID the Chair and lead designer should:

The chair should be suitably competent including training, qualifications and experience.

At the HAZID meeting a comprehensive record should be completed at the meeting. This should include the wording of any actions, the actionee and return date. Any action sheets should be issued straight after the meeting. The chair should review the closeout action comments and check the evidence to ensure closure, where possible. Any actions unable to be closed out during the design, should be transferred to the CDM Risk Register.

Once all of the action sheets have been completed, to the satisfaction of the chair, then a closeout report shall be prepared. The report will include all relevant documentation, or references to the drawings used, including revision status.

DPS Brand Colours Line DPS Construction workers Hard Hat Image