Skanska JV Design Risk Studies and HAZCON’s
Skanska were awarded a contract to design and build a replacement high-pressure gas pipeline within a tunnel, underneath the River Humber from Paull to Goxhill, replacing the existing pipeline, which lies on the riverbed.
Over the three year project the joint venture will provide full design and construction of the 5km tunnel underneath the river Humber, inserting a single string of 42” steel pipe and connect into the above-ground installations (AGIs) at Paull and Goxhill.
As part of the FPSA process DPS chaired the Design Risk Studies and HAZCON’s. Due the scale of the project these were broken down in to manageable chunks