Holford Salt Cavern Upgrade Project
DPS supported the Holford and Warburton salt cavern upgrade from feasibility through to construction completion.
Key contributions included:
- Project management of feasibility studies evaluating options to replace or upgrade volumetric control, instrumentation, and telemetry systems
- Management of conceptual design development for Cadent based on feasibility recommendations
- Delivery of detailed design safety studies, including HAZID, HAZOP, Safe Working Design, and HAZCON across both sites
- Acting as Principal Designer from conceptual design through construction